Windsor & Essex demolition
Open 24/7226-406-0125

Local permissions

Define the electrical boundary before interior demolition

An interior demolition scope should say where removal work stops and electrical work begins. That boundary is especially important when some rooms or building systems must remain in use while other finishes or fixtures are removed.

Reviewed 1 November 2026

In this guide

Identify the authorised electrical business

Ontario’s Electrical Safety Authority explains that a Licensed Electrical Contractor is the business to hire for electrical work in a home. It also says a general contractor must use an appropriately licensed electrical subcontractor rather than assume that general construction authority covers the work. Confirm the business and its licence through ESA.

The demolition quote should identify whether electrical coordination is included, excluded or being arranged directly by the owner. Naming an electrician in conversation is not enough if no one has agreed who engages them or what their scope covers.

Describe what must remain supplied

List occupied rooms, shared services and equipment that need to remain available. Mark proposed removal areas on a plan and give the electrical contractor that same version. Ask that professional to determine the isolation, alteration and verification required; do not use a light switch or an inactive appliance as a safety test.

The responsible parties should agree how readiness for demolition will be communicated. Keep any relevant utility and ESA records with the project file. A building permit and an electrical notification are different records, and one should not be described as the other.

Close the boundary at handoff

After the agreed electrical work, obtain the records appropriate to that work and identify anything outstanding. The next trade should know which services are retained, changed or awaiting further work. Avoid describing an incomplete electrical stage as fully ready simply because finishes have been removed.

Tell YAK about electrical arrangements and retained supplies during the enquiry. Electrical work needs a Licensed Electrical Contractor. Confirm who will arrange that work before demolition begins.

Bring these details

  • Licensed electrical business identified
  • Owner versus contractor coordination agreed
  • Retained supplies included in the plan
  • Readiness and completion records specified

Sources and local contacts

Use these primary sources to check the current requirements for your property.