Windsor & Essex demolition
Open 24/7226-406-0125

Materials and records

Record neighbouring conditions before work

A dated condition record can help a later conversation distinguish an existing feature from a newly observed concern. It is a factual record, not proof of cause or a structural assessment. Agree the appropriate extent with the project team before photographing adjoining property.

Reviewed 1 November 2026

In this guide

Agree access and permission

Identify the relevant boundaries, shared surfaces or adjacent areas from the proposed scope. Ask the owner or authorized representative to arrange any necessary permission. Do not enter neighbouring property or point a camera into private occupied spaces simply to complete a record.

Where a professional condition survey is appropriate, discuss that separately. Ordinary photographs taken for planning do not replace a survey, engineering advice or the records an insurer or other party may require.

Keep observations neutral

Use wide views to show location and closer views to show the visible feature. Label the date, position and direction. Describe what is visible, such as a surface crack or worn paving, without deciding its cause, age or significance.

Preserve the original files and keep any annotations in copies. Avoid filters or edits that change the appearance of the condition. If access was restricted or a surface was obscured, record the limitation rather than implying that the whole area was inspected.

Use the record responsibly

Agree who holds the record and when it will be reviewed. If a concern is reported during work, share the relevant information through the project contact and arrange appropriate assessment. Tell YAK about close neighbours or shared elements at enquiry stage so the need for starting-condition records can be discussed.

Bring these details

  • Arrange appropriate access
  • Record facts without diagnosis
  • Keep originals and limitations