Identify what each drawing represents
Record the title, author, date and revision where available. Distinguish an original plan, a proposed renovation drawing, a survey and a sketch prepared for an enquiry. Keep the original file unchanged and make annotations on a separate copy.
If you have several versions, identify the one currently being used for planning. Do not delete an older drawing that explains existing construction, but label it clearly so it cannot be mistaken for the latest proposal. A dated folder is easier to use than a message thread containing unnamed images.
Record differences rather than resolving them yourself
Note visible differences between the drawing and the property, such as an extra partition or a changed doorway. Photograph the discrepancy from a safe accessible position. Do not use a drawing to conclude that a hidden service is absent or that an element can be removed.
Ontario’s permit guidance requires approved plans to remain available on site and changes to be brought to the municipality. The authority-facing drawing requirements belong with the relevant permit process; an enquiry sketch is not a substitute.
Share only the relevant package
Give YAK the pages that explain the requested work and retain the document index for reference. Ask which missing views or professional assessments would affect the scope. Redact unrelated personal information, while keeping dimensions, revision notes and other project details needed for review.
Bring these details
- Label purpose and revision
- Keep originals and marked copies separate
- Flag observed differences
Sources and local contacts
Use these primary sources to check the current requirements for your property.
- Building permits: Citizen’s guide to land use planning (opens a new tab)Government of Ontario · Checked 2026-11-01
