Plan designated-substance information before demolition

Material information belongs at the beginning of a demolition discussion. The question is not simply whether a building looks old. It is which substances may be present in the areas the proposed work will affect, and what reliable records exist.

Reviewed 1 November 2026

In this guide

Identify the assessment duty and scope

Ontario’s guidance explains the project-owner duties in section 30 of the Occupational Health and Safety Act to identify designated substances and communicate the information before contracting. The applicable responsibilities should be reviewed for the project with an appropriately qualified adviser. Do not assume that a residential setting removes every contractor or worker obligation.

Tell the assessor what will be disturbed, including layers behind finishes if they are within the proposed scope. A report for one room or a previous renovation may not answer a new question about a different area.

Read the limits, not just the conclusion

Check the report’s date, inspected locations, material descriptions and any excluded or inaccessible areas. Keep the original report together with its plans and laboratory information where provided. A short email saying no issues found loses the boundaries that make the information useful.

Ask the report author to address any gap between the survey and the proposed removal. The demolition contractor should not be expected to convert an incomplete document into a building-wide conclusion. Unknown conditions need a decision before the affected work is committed.

Share consistent information for assessment

Provide the same relevant report to the parties pricing and planning the work. Record any specialist work or further assessment that remains separate from ordinary demolition. This makes competing scopes easier to understand without implying that every bidder includes regulated material handling.

In the YAK enquiry, say whether a survey exists and which part of the property it covers. Do not sample, disturb or transport suspect material to help obtain a quote. This guide supports informed preparation; it is not a material diagnosis or an offer of abatement or remediation services.

Bring these details

  • Affected material areas defined
  • Applicable professional assessment arranged
  • Report exclusions and inaccessible areas reviewed
  • Relevant information shared before scope agreement