Commercial premises

Check the next commercial use before stripping the premises

A vacant shop, office or restaurant is not automatically ready for a different business once its fittings are removed. The proposed use can affect the design and approval questions. Establish those requirements early so demolition does not remove something the next layout needs or preserve something that must change.

Reviewed 1 November 2026

In this guide

Explain the proposed activity

Tell the design team what the premises will be used for, which areas will be occupied and whether the proposal changes the layout. Share the existing approved information when available. If the next tenant or use is not known, make that uncertainty explicit.

Separate the physical strip-out from the suitability of the building for the new operation. An empty floor plan is not evidence that exits, washrooms, services or other building features meet the needs of a different use.

Let approval decisions guide removal

Ontario’s Building Code Act addresses changes of use, including circumstances where a permit is required even without proposed construction. The relevant municipality and qualified design team should determine how the actual proposal is treated. A demolition contractor should not be asked to resolve that classification from a marketing description.

Use the resulting plans to mark retained and removed elements. Identify any investigation required before design can be completed. Avoid clearing all existing systems while the project team is still deciding which ones can be reused.

Issue a defined demolition brief

Provide YAK with the approved or developing removal plan, the next-use objective and the status of outstanding decisions. Ask for assessment of the identified demolition portion. Design, approvals, new installations and permission to occupy are separate outcomes, and should have their own responsible parties rather than being implied by a strip-out quotation.

Bring these details

  • State the proposed use or record that it is undecided.
  • Obtain municipal and design review.
  • Base removal on the resulting retained-item plan.

Sources and local contacts

Use these primary sources to check the current requirements for your property.