Build an equipment disposition list
Identify cooking equipment, refrigeration, counters, fitted seating, shelving and decorative finishes. Confirm which items are owned, leased, retained, collected or disposed of. Ask the responsible equipment specialist about any requirements for safe disconnection, recovery or transport.
List extraction systems, grease-related installations and fire-suppression equipment separately from ordinary fittings. Their removal or alteration should not be assumed to fall within a general demolition scope. The building owner and relevant specialists need to establish what remains.
Resolve service and approval boundaries
Identify gas, electrical, water, drainage, ventilation and fire-protection responsibilities before physical removal. Shared or base-building systems may continue serving other spaces. Provide the available drawings and reports rather than relying on a walk-through to establish that everything is redundant.
Describe known material concerns, residues and the condition of the premises. Cleaning, remediation and specialist equipment work require explicit assessment and scope owners. A demolition enquiry does not establish that YAK provides those services or that the space is suitable for food use afterwards.
Describe the next fit-out
Give the assessor the approved retained-item plan, equipment collection sequence and expected handover condition. If the next use is undecided, say so; avoid specifying an undefined “ready for the next tenant” endpoint. Contact YAK with the actual removal package so access, dependencies and specialist decisions can be considered together.
Bring these details
- Confirm equipment ownership and collection.
- Separate extraction and fire systems from fittings.
- Define the intended next use and physical endpoint.
Sources and local contacts
Use these primary sources to check the current requirements for your property.
- Regulatory roles for construction and renovations (opens a new tab)Ontario Ministry of Municipal Affairs and Housing · Checked 2026-11-01
- Buying a renovated home: electrical work (opens a new tab)Electrical Safety Authority · Checked 2026-11-02
- Ontario Fire Code (opens a new tab)Government of Ontario · Checked 2026-11-01
