Handle an unexpected finding without guessing

Hidden construction and previous alterations can raise questions that were not answerable before work. The owner’s role is to help the right decision happen, not to diagnose the finding from a photograph or encourage work through uncertainty.

Reviewed 1 November 2026

In this guide

Ask what is known and what is not

Have the responsible contractor describe the observed condition, its location and the activity affected. Separate an observation from a suspected cause. If the issue may involve structure, services or hazardous material, the appropriate professional assessment must guide the next step.

Do not enter the affected area, disturb material or ask someone to make an opening solely to provide a better image for discussion. Follow the site arrangements established by the responsible team. Photographs are records, not a substitute for assessment.

Keep the affected decision visible

Record which work is paused or excluded while the question is resolved, who will obtain advice and who can authorize a revised scope. Ask whether unaffected work can proceed under the existing arrangement; do not assume that it can.

If the proposed response changes the agreed scope or approved plans, address the commercial and authority requirements separately. A verbal suggestion is not a completed assessment or an approved change.

Restart from a documented instruction

Keep the relevant assessment, revised scope and authorization together. Make sure the people carrying out the work receive the current instruction. When enquiring with YAK about an already exposed condition, describe what is visible and what records exist without presenting an unverified diagnosis as fact.

Bring these details

  • Record observations and uncertainty
  • Identify the appropriate assessor
  • Document the instruction before restart